Case Studies
Filter By Service

Mater Hospital, Belfast
AC Automation designed, supplied, and commissioned a Power Management Control System for Belfast Health and Social Care Trust’s Mater Hospital site, delivering a fully integrated platform for managing multiple electrical assets through a single coordinated architecture. Built on ComAp controllers, the system coordinates two transformer incomers, two synchronising generators, a 2 MW battery energy storage […]

Royal Victoria Hospital, Belfast
AC Automation was appointed by Belfast Health and Social Care Trust (BHSCT) to design, supply, install, and commission a replacement standby generator at the Royal Victoria Hospital. The project saw an ageing 650 kVA generator removed and replaced with a new 1,100 kVA containerised set — delivering significantly increased standby capacity to one of Northern […]

UEFA Super Cup Final, Belfast
AC Automation was appointed by the Irish Football Association (IFA) to deliver temporary power generation for the UEFA Super Cup Final 2021 at Windsor Park, Belfast — the showcase fixture between Chelsea and Villarreal that opened the European football season. Two 550 kVA hire generators were supplied, synchronised with the mains supply, and run in […]

UK Government, Scotland
AC Automation was appointed by principal contractor Graham to design, supply, install, and commission a fully integrated standby power system for a UK government client in Scotland. The project replaced ageing standby plant with a resilient three-generator installation, supported by an upgrade to the site’s high-voltage electrical infrastructure — all delivered in-house.
Why Choose Us
Backed by over 35 years of experience, our own in-house engineering team and trusted specialist partners give clients a single point of contact across their wider power infrastructure.
Contact Us